Gas turbine in our workshop

In cooperation with a client we have brought in a Siemens SGT600 to our workshop, for an overhaul. Normally lots of our rotating work is done on site. However, now we chose to execute the work in our workshop.

This has the following benefits:

✅ Well equipped workshop with al desired facilities
✅ Less costs for the client (hotel- and daily allowance costs)

Four mechanics have rolled out the turbine on location and made ready for transport. In our workshop the gas turbine has been disassembled and parts have been inspected. Based on the maintenance plan and findings of the inspections, new parts have been ordered. The parts which will be used again are checked and cleaned.

With the new parts, the gas turbine will be reassembled in May.